Error in Custom 22 Piezo (P22, P24) Schematic?

The non-Piezo Custom 22 has the same verbiage and the drawing reflects it properly. I’m wondering if the red/hot from the switch is just routed to the Piezo PCB first? So it could be, and is likely, correct, just really should include “from PCB” or something, not say direct from switch to pot.

I posted here to see if I was missing something. It’s a change I would recommend if I’m correct. I didn’t want to send PTC an unnecessary email if I’m wrong.

It matters to me because it’s the only Piezo diagram. I have an SE Piezo, which there’s no diagram for. The two are similar, except Core models have an extra switch, according to PTC email.
 
Back
Top